Commissioning & Start-Up
Installation Assistance
When required by the client, Unitel will send appropriate personnel to the client’s site to assist in the reassembly of the modules. Generally these modules have to be reassembled in a very systematic preprogrammed sequence, and our engineers are very familiar with these procedures.
Operating Guidelines
Maintenance Guidelines
Where requested, Unitel can provide maintenance guidelines to allow our clients to develop a preventative maintenance program or mechanical integrity program for the modular system. These guidelines also provide recommendations for maintaining an inventory of parts and spares to enable effective operation of the process equipment.
Onsite Commissioning Assistance
Unitel can provide onsite commissioning and start-up assistance to our clients as needed.
Site Acceptance Test (SAT)
Performance tests are conducted based on mutually agreeable terms and conditions determined at the appropriate phase of the project.