The FEED stage typically requires contributions from other engineering disciplines based on the requirements of the project including:
- Mechanical Engineering
- Piping Design
- Electrical Engineering
- Control Engineering
- Structural Engineering
The FEED stage typically requires contributions from other engineering disciplines based on the requirements of the project including: