479 Business Center Dr., Suite 105 Mt. Prospect, IL 60056
(847) 297-2265

Reactor Selection

Reactor type selection and design is usually an important aspect of the Feasibility Study phase of a project. Reactor type selection can have a significant impact on other unit operations of a process system and is a critical item to be selected early in the process development effort.

Over the years, engineers at Unitel Technologies have accumulated extensive knowledge about a variety of reactors that can be utilized for different processes.

Lab Scale Reactors

Spectrum Gradientless Reactors

  • Configured for homogeneous catalytic reactions
  • Configured for heterogeneous reactions…kinetic basket
  • Configured for heterogeneous reactions…static basket

Fixed Bed Tubular Reactors

Pilot Plant & Demo Plant Reactors

Hydroprocessing Reactors

  • Fixed Bed Isothermal Reactors
  • Fixed Bed Adiabatic Reactors
  • Ebulliating Bed Reactors

Fischer-Tropsch Reactors

  • Multiple Fixed Bed Adiabatic Reactors
  • Multi Tube Boiling Water Reactors
  • Fluidized Bed Reactors

Polymerization Reactors

  • Stirred Tank Batch Reactors
  • Stirred Tank Continuous Reactors
  • Stirred Tank Cascading Reactors
  • Plug Flow Tubular Reactors
  • Loop Reactors
  • Vapor Phase Fluidized Bed Reactors

Circulating Fluidized Bed Reactors

  • Cat Cracking Reactors
  • Biomass Pyrolysis Reactors

Services

View all Services
CE
Conceptual Engineering

The early stages of front end project and process development are critical for the future success of projects involving new technologies and processes.

Read More...
FS
Feasibility Study

The feasibility study phase generally consists of a technical and economic analysis to investigate the probable outcomes of a project.

Read More...
FEED
Front End Engineering & Design (FEED)

The feasibility study phase generally consists of a technical and economic analysis to investigate the probable outcomes of a project.

Read More...
DED
Detailed Engineering & Design

This is the initial phase in the execution of the project. The objective of this phase is to develop all detailed engineering and design drawings and documents.

Read More...
P
Procurement

Procurement policies and procedures are of significant importance for implementing a project on schedule while retaining quality.

Read More...
F
Fabrication

Unitel maintains a leased facility for the fabrication of high quality modules. Good fabrication procedures and safety during fabrication are of critical importance to us.

Read More...
CS
Commissioning & Start-Up

Unitel provides installation procedures and guidelines to assist the client in installing the modules. We always provide appropriate personnel for this activity.

Read More...