479 Business Center Dr., Suite 105 Mt. Prospect, IL 60056
(847) 297-2265

Hazardous Area Drawings

The majority of our projects involve hazardous area locations. We can develop hazardous area drawings for the modular system proper or for the plot or site where the system will be installed. We can develop drawings based on client requirements or we can also provide code review service to assist our clients in determining and identifying the correct hazardous area classification for a project.

Services

View all Services
CE
Conceptual Engineering

The early stages of front end project and process development are critical for the future success of projects involving new technologies and processes.

Read More...
FS
Feasibility Study

The feasibility study phase generally consists of a technical and economic analysis to investigate the probable outcomes of a project.

Read More...
FEED
Front End Engineering & Design (FEED)

The feasibility study phase generally consists of a technical and economic analysis to investigate the probable outcomes of a project.

Read More...
DED
Detailed Engineering & Design

This is the initial phase in the execution of the project. The objective of this phase is to develop all detailed engineering and design drawings and documents.

Read More...
P
Procurement

Procurement policies and procedures are of significant importance for implementing a project on schedule while retaining quality.

Read More...
F
Fabrication

Unitel maintains a leased facility for the fabrication of high quality modules. Good fabrication procedures and safety during fabrication are of critical importance to us.

Read More...
CS
Commissioning & Start-Up

Unitel provides installation procedures and guidelines to assist the client in installing the modules. We always provide appropriate personnel for this activity.

Read More...